Focus
Process redesign, logic correction, workforce readiness
Amazon / operations at scale
Inside a high-variance operating environment, I focused on two problems: process bottlenecks that were leaking money and a logic issue that was generating costly picking errors at scale.
Focus
Process redesign, logic correction, workforce readiness
Environment
Large-scale fulfillment and operational systems
Anchor result
$2.1M projected annual savings
Situation
The first problem was network-wide process inefficiency across operational flows. The second was a logic issue in the system-wide picking process that created a high volume of erroneous picks and retraining load.
Approach
Outcomes
$2.1M
Projected annual savings from process redesign and SOP standardization.
$216K/day
Waste mitigated by correcting logic tied to 180K erroneous picks per day.
100+
Associates covered in a training roadmap aimed at higher TPH and lower error rates.